All projects

Radio & telecom

LEO satellite link (telemetry)

Advanced60 min

A telemetry link with a low-Earth-orbit satellite: very long distance, low power and Doppler shift.

What you get

A telemetry frame received across 1000 km, after correcting the Doppler shift.

Parts (simulated)

  • Built-in RF/SDR lab
  • Space channel model
  • Doppler corrector

Nothing to buy: every component here is simulated in the browser.

Project steps

  1. 01Set the distance and transmit power.
  2. 02Observe free-space loss in the link budget.
  3. 03Introduce Doppler shift from the passing satellite.
  4. 04Choose a robust modulation and a suitable rate.
  5. 05Check the integrity of the received frame.

What you learn

  • Free-space path loss
  • Doppler effect
  • Robustness vs throughput
  • Telemetry framing

Other projects